top of page

Construction from the SIPsCZ building system can be realized throughout the year.

Thanks to the use of a dry construction process, the realization time will be greatly shortened to two to four months. This process is even shorter if the substructure is realized from our system.

  • Grey Facebook Icon
  • https://www.youtube.com/channel/UCQk
bottom of page